Article 764

Code of Obligations and Contracts (DOC)

9-1913Dahir du 12 août 1913 (DOC) · version consolidée

Unofficial translation. The English interface is for information only — only the Arabic text published in the Bulletin Officiel is authentic. Read this page in العربية · Français

If it is necessary, for the execution of the work, that the principal do something on his side, the contractor has the right to invite him formally to do it. After a reasonable period, and if the principal has not done what he must, the contractor has the choice either to maintain the contract or to seek its resolution, with damages in both cases, if applicable.