Article 769

Code of Obligations and Contracts (DOC)

9-1913Dahir du 12 août 1913 (DOC) · version consolidée

Unofficial translation. The English interface is for information only — only the Arabic text published in the Bulletin Officiel is authentic. Read this page in العربية · Français

(Modified, D. 3 December 1959 - 7 joumada II 1379): The architect or engineer and the entrepreneur directly engaged by the master are liable when, within ten years from the completion of the edifice or other work whose works they directed or executed, the work collapses, in whole or in part, or presents an evident danger of collapsing, by defect of the materials, by vice of construction or by vice of the soil. The architect who did not direct the works is liable only for defects in his plan. The ten-year period begins to run from the day of acceptance of the works. The action must be brought within thirty days from the day on which the fact giving rise to the guarantee was verified; it is not admissible after this period.