Article 773

Code of Obligations and Contracts (DOC)

9-1913Dahir du 12 août 1913 (DOC) · version consolidée

Unofficial translation. The English interface is for information only — only the Arabic text published in the Bulletin Officiel is authentic. Read this page in العربية · Français

In all cases where the workman supplies the material, if the work perishes, in whole or in part, by fortuitous event or force majeure, before its acceptance, and without the principal being in default of accepting it, the contractor shall not be liable for the loss, but he may not claim the price.