Article 952

Code of Obligations and Contracts (DOC)

9-1913Dahir du 12 août 1913 (DOC) · version consolidée

Unofficial translation. The English interface is for information only — only the Arabic text published in the Bulletin Officiel is authentic. Read this page in العربية · Français

In all cases where the master is not bound to recognize the expenses made by the manager, the latter has the right to remove the improvements carried out by him, provided that he can do so without damage, or to have returned to him the things purchased by him and which the master has left for his account.