The principal is bound to accept the work when it conforms to the contract, and to transport it at his expense if it is capable of being transported. Where the principal is in default of accepting the thing and where there is no fault on the part of the workman, the loss or deterioration of the thing shall be at his risk, from the time of the default duly established by a summons made to him.
Article 774
Code of Obligations and Contracts (DOC)
Unofficial translation. The English interface is for information only — only the Arabic text published in the Bulletin Officiel is authentic. Read this page in العربية · Français
